Construction of a double road tunnel in the Kougi location, total length 500m
CLIENT: J/V AVAX S.A.- GENER S.A – ETETH S.A – TEG S.A
YEAR: 2000-2002
Construction of a double road tunnel in the Kougi location, total length 500m
CLIENT: J/V AVAX S.A.- GENER S.A – ETETH S.A – TEG S.A
YEAR: 2000-2002