Double road tunnel with underground excavation below the PPC Power Station Length 400 m. section 75 m2.
CLIENT: J/V AVAX S.A. – ROUTSIS S.A.
YEAR: 1998
Double road tunnel with underground excavation below the PPC Power Station Length 400 m. section 75 m2.
CLIENT: J/V AVAX S.A. – ROUTSIS S.A.
YEAR: 1998