Drilling Paste Distribution network at the Olympians Mine
Drilling 8 ½” boreholes, pipe fitting and cementing of Paste Distribution network, total length 1200m. CLIENT: HELLAS GOLD S.A. YEAR: 2018
Drilling 8 ½” boreholes, pipe fitting and cementing of Paste Distribution network, total length 1200m. CLIENT: HELLAS GOLD S.A. YEAR: 2018
Opening a inclincned Ramp+117, cross section 28 m2, length 1500m, inclination-14% CLIENT: HELLAS GOLD S.A. YEAR: 2017-2019
Opening a research gallery +228, cross section 14m2 length of 1200m CLIENT: HELLAS GOLD S.A. YEAR: 2016-2018
Executions of 10.000m of mining drilling, depths up to 700m vertical of inclined with Wire Line CLIENT: HELLAS GOLD A.E YEAR: 2012-2018
Execution of 4 exploratory mining boreholes up to 600m with DTH method core with Wire Line CLIENT: ELMIN BAUXITE S.A YEAR: 2016
Production of underground mining with sublevel of ,300m lenght CLIENT: LARCO S.A. YEAR: 2006-2009
Tunell opening with total length 6000m, section 25m2, in limestone and permanent support with anchors and spray shotcrete CLIENT: S&B Industrial Minerals YEAR: 2006-2009
Works of Ore Production Tunnels with a cross section of 15m2,450m length CLIENT: Γ.Μ.Μ.Α.Ε ΛΑΡΚΟ YEAR: 2005-2006
Removal of Ore in the underground mining of Ag. Ioannis CLIENT: G.M.M A.E LARCO YEAR: 2003-2004
Drilling in the Underground – Tunnels in the Bauxite Mines in 51km Lamias Amfissas. CLIENT: S&B Industrial Minerals S.A. YEAR: 2002