Drilling of Monitoring Holes in underground Tunnels in the quarry area DIONYSOU PENDELIS
Construction of 90 boreholes with a length of up to 50m in the underground marble mines. CLIENT: DIONYSOS PENTELI MARBLES YEAR: 2000
Construction of 90 boreholes with a length of up to 50m in the underground marble mines. CLIENT: DIONYSOS PENTELI MARBLES YEAR: 2000
Spraying of concrete and drilling of anchors in surface slopes in the Road opening Arahovis- Fterolaka CLIENT: J/V ATLAS – KOLOVARIS YEAR: 1999
Spray Concrete on Surface slopes and within the Tunnel LEFKOPETRAS EGNATIAS ODOS CLIENT: J/V ACTOR S.A. – MICHANIKI S.A. YEAR: 1999
Double road tunnel with underground excavation below the PPC Power Station Length 400 m. section 75 m2. CLIENT: J/V AVAX S.A. – ROUTSIS S.A. YEAR: 1998
Double Road Tunnel with underground excavation into Piraeus Port. Length 350m cross section 75 m2. CLIENT: J/V AVAX S.A. – ROUTSIS S.A. – TECHNODOMI YEAR: 1997-1998
Drilling and construction pilling of support in the tunnel project of PLATAMONA /ERGOSE CLIENT: J/V ATHINA- CIS-DOKAT- TERNA. YEAR: 1998
Spray concrete on Cut and Cover Tunnel Excavation CLIENT: J/V ATHINA CIS-DOKAT- TERNA YEAR: 1998
Loading and hauling in excavation works of pilot tunnel section 12 m2 and length 200 m. CLIENT: ATHENS METRO J/V CIVIL WORKS YEAR: 1997
This course is based on CBT technology and includes the use of a multimedia platform on tablets. The course uses PDF technical documents, video-animation and 3D content. If the course is held at SOILMEC SPA (Italy), in addition to the multimedia component on CBT, training meetings can also be organized with specialist personnel, so as…