Construction of Tunnel +228 in the Mavres Petres mine in the STRATONI MINES
Opening a research gallery +228, cross section 14m2 length of 1200m CLIENT: HELLAS GOLD S.A. YEAR: 2016-2018
Opening a research gallery +228, cross section 14m2 length of 1200m CLIENT: HELLAS GOLD S.A. YEAR: 2016-2018
Construction works of the VALTOU Tunnel, 15m2 section, 2100m length CLIENT: ANASTILOTIKH ATE YEAR: 2013-2016
Drilling, Grouting and Coring holes with Wire Line depth 50m and mounting of control instruments. Execution of cement grouting works CLIENT: J/V MAGAFINIS-FILIPPOS S.A YEAR: 2013-2018
Executions of 10.000m of mining drilling, depths up to 700m vertical of inclined with Wire Line CLIENT: HELLAS GOLD A.E YEAR: 2012-2018
Execution of 4 exploratory mining boreholes up to 600m with DTH method core with Wire Line CLIENT: ELMIN BAUXITE S.A YEAR: 2016
Construction of horizontal drilling and fitting of 101mm tubes for Forepoling support CLIENT: OSSA HELLAS YEAR: 2010
Tunnel support, construction with Forepolling, section 100m2 CLIENT: J/V IONIA ODOS YEAR: 2010
Construction of tunnel support with Forepoling CLIENT: MOCHLOS Α.Ε YEAR: 2008
Drilling and sampling of curtains and cement grouting works. CLIENT: ERGO ATE YEAR: 2008-2009
Rock Excavation Support with F.P., Metal frames, Sprayed Concrete & Anchors Final Lining CLIENT: ERGO ATE YEAR: 2008-2009